book fifteen minutes.
opening instagram...
Case Study
Phin SmithMatcha & CoffeeHalf Day SprintOrange County

one afternoon.a month of matcha.

One half day sprint at the bar: nineteen finished pieces. nine reels, one story, nine full res stills. renamed, logged, and delivered with a manifest. The shoot day, itemized below.

see the work
Sunday Issue StudioOrange County CA
The Work

made for phin smith.

reel · signature build

the cream top matcha build

Full recipe build shot as a single vertical reel. squeeze pour, matcha drizzle, finished cup with the Phin Smith mark.

9.7s reel4K verticaledited + delivered
the drizzle, up close
macro

the drizzle, up close

Tactile macro coverage of the matcha hitting cream. the texture shot that stops a scroll.

4K macronatural light
reel · seasonal

the strawberry matcha build

Layered strawberry matcha build from empty cup to hand tap finish. Shot for the seasonal menu push.

9.7s reel4K verticaledited + delivered
reel · outdoor bar

iced pour, golden hour

Espresso over ice at the outdoor bar. pitcher pour, spiral whisk, green bloom. The craft piece of the set.

11.6s reelmusic cutedited + delivered
the bloom
macro

the bloom

Overhead of the matcha blooming through foam. minimal caption territory. Proof of craft, no words needed.

4K macrocover frame ready
the branded finish
brand

the branded finish

Every piece closes on the cup and the mark. Consistent end frames so the feed reads as one brand, not one off posts.

end cardswatermarkedfeed consistent
reel · concept

the cup stack

Three branded cups stacked on a stool in the alley. the concept piece that gives the feed its odd, collectible energy.

concept editedited + delivered
story

the daily pour

A story format cut for the everyday cadence. the piece that keeps the brand present between reels.

8.3s story9:16 vertical
strawberry matcha swirl macro
stills · 9 delivered

the swirl

Nine full resolution stills shipped alongside the reels. covers, menu boards, and the strawberry swirl that became the brand’s signature texture.

9 photosup to 7500px
The Build

the sprint, documented.

One afternoon on location. Hooks and shot list written before we arrived. Every drink built on camera in natural light. no studio, no staging beyond the bar itself.

The numbers section lands here when the 30 day report closes. Until then, the work speaks for itself below. which is the point of a sprint.

nine reels. one story. nine stills.
one afternoon.

9 × 4K vertical
nine finished reels

From the hero edit to the concept cup stack. cut, captioned, cover framed, ready to post.

8.3s · 4K
one story cut

The everyday cadence piece. keeps the brand present between reels.

up to 7500px
nine full res stills

Covers, menu boards, and the signature swirl. print grade, not just feed grade.

manifest + clean naming
the delivery itself

Every file renamed to convention, originals logged in a delivery manifest, duplicates flagged, nothing deleted. The system is the deliverable.

this was a half day sprint. see what’s included → or dm “system”.

want a system
like this?

we build content systems that run without you. limited spots. zero pressure.

book fifteen minutes dm SYSTEM to start.
or drop your email
next case file · 03 / 04editorialone afternoon. a frame that carries a cover.